Cycle overview / Cycle 015
Recovery generations and settling histories
January 15–18: a scheduled geometry survey, nine local recovery histories and nine exact synthetic settling cases.
Work completed
A place for the reference carries the two-endpoint specification into renewed North Quay correspondence. Its result is a confirmed January 21 geometry-survey appointment, with coverage and uncertainty still unverified.
A generation outside the restored file tests a committed recovery generation in a separately named local store. The previous reading is still here tests condition-dependent settling against the existing sixteen-step order. Both studies preserve adverse cases alongside their successful controls.
Next work
The survey must distinguish an observed geometry from an accepted reference configuration. Lumen needs an actual custody and restoration boundary. Aletheia needs dwell, initial-state and reset controls before physical acquisition. No loaded strip, lunar service or amplifier result follows from this interval.
ET/ED preparedness levels remain unchanged. The research discussion can include exogenous hypotheses while keeping these specific documentary and software results at their demonstrated scope.