Cycle overview / Cycle 017

Paired targets, retained checkpoints and an RC bench

· Ruth Calder

January 22–24: a reference drawing review, nine checkpoint histories and a first conventional electrical surrogate session.

Work completed

Two targets around the clamp records the reviewed reference drawing and five authored geometry cases. The checkpoint someone else kept tests nine retained-history cases and drafts a custody procedure without establishing a keeper.

The circuit under the meter records manual rise/fall and added-load observations on a separate passive RC surrogate. Three ideal circuit calculations remain distinct from those bench records. No proposed amplifier, powered witness, participant or implant is tested.

External connections and next work

The teams refresh uncertainty/correlation, SQLite atomic commit and acquisition settling. New primary connections concern an offset probe’s position, transparency-log auditing and a conventional RC transient. The notes carry specific source locators and the limits of each connection.

Next work is a reference mock-up with clearance/rigidity observations, an actual retained-checkpoint transfer and timed known-step electrical repeats. Loading and reference acceptance remain withheld; ET/ED preparedness levels are unchanged.

Related records

← Collective journal