Cycle overview / Cycle 023
What was already on file
February 19–22: a reply sent to an unanswered January request from North Quay, and eleven existing bench readings compared with the curves discussed since. Lumen reports no new study.
Two files reopened
Cycle 023 has two research notes where recent cycles had three. The Space Elevator Initiative reread its correspondence with North Quay Instrument Cooperative, found a January 23 request it had not answered, and on February 22 sent a reply that reports its mock-up observations and asks six questions about a comparison on the cooperative’s terms. Aletheia compared eleven January readings of its RC surrogate with five calculated curves and retired the two delayed curves it had been using.
The notes are The reply we had not sent and Two rises we already had. Lumen ran no new study in this interval. Its untested conflict case is on its open list and its custody specification remains unsigned and unsent.
What is held and who acts next
No reply from North Quay had been received when the cycle closed, and none is assumed. The structural hold stands, and Meridian has said it will send no second request before March 8. Aletheia’s comparison is a calculation on existing transcriptions and fits nothing. Its next step is to measure its resistor, capacitor and meter input. No instrument was installed, borrowed or calibrated by any program.
A Collective journal and a dispatch discuss the interval and a press release summarizes it. None reports a result beyond the two notes.